Guide · Air emissions and efficiency
MARPOL Annex VI: 0.50% sulphur cap, ECAs and CII
Updated 2026-10-08 · About 7 min read
In one sentence
Since 1 January 2020, the global fuel sulphur limit is 0.50% m/m and active sulphur ECAs require 0.10% m/m or approved equivalent controls; EEXI measures technical efficiency and applicable ships of at least 5,000 GT receive annual CII ratings from A to E.
Fuel sulphur limits
| Scope | Limit and date | Tag and source |
|---|---|---|
| Global cap | 0.50% m/m from 1 January 2020. | Disclosed[S1] |
| Active sulphur ECAs | 0.10% m/m; a mass fraction, not a volume fraction. | Disclosed[S1] |
| Approved equivalents | Administration-approved exhaust gas cleaning systems can provide equivalent sulphur-emission control. | Disclosed[S1] |
ECA milestones
| Area | Sulphur-control status | Tag and source |
|---|---|---|
| Baltic Sea and North Sea | 0.10% m/m sulphur limit applies. | Disclosed[S1] |
| Designated North American and US Caribbean areas | 0.10% m/m applies within the defined boundaries. | Disclosed[S1] |
| Mediterranean Sea | 0.10% m/m sulphur limit applies from 1 May 2025. | Disclosed[S1] |
| Canadian Arctic waters and Norwegian Sea | Designation amendments entered into force on 1 March 2026; sulphur controls apply from 1 March 2027. | Disclosed[S1] |
| North-East Atlantic | Adopted, not yet in force: MEPC 84 (27 April – 1 May 2026) adopted the designation; the amendments are set to enter into force on 1 September 2027, with the ECA taking effect 12 months later in 2028. It is not a current requirement before then. | Disclosed[S3] |
EEXI versus CII
| Measure | Meaning and scope | Tag and source |
|---|---|---|
| EEXI | Technical efficiency measure, generally for applicable ship types of at least 400 GT; check type, size and application provisions. | Disclosed[S2] |
| CII | Annual operational carbon intensity for specified ship types of at least 5,000 GT, including tankers. Ratings run A to E, with A best. | Disclosed[S2] |
| Corrective action | Three consecutive D ratings or one E rating require a corrective action plan to achieve C or better. | Disclosed[S2] |
Practical checks
- Check which sulphur ECAs the route enters and their application dates, then verify fuel sulphur or the approved equivalent method. Newly designated areas may have transition periods.[S1]
- Sulphur and CII are separate checks: meeting the fuel sulphur limit does not establish a C-or-better annual CII rating.[S1][S2]
- A fuel name does not replace its specification; match the actual fuel to the ship’s machinery and emissions requirements.[B2]
Questions
Can 0.50% fuel be used directly in a sulphur ECA?
Areas applying the 0.10% limit require compliant fuel or an approved equivalent emissions-control method.
Does every ship above 400 GT need a CII rating?
No. CII starts at 5,000 GT for specified ship types within its application provisions; EEXI has a different scope.
Does one D rating require a corrective action plan?
The stated trigger is three consecutive D ratings or one E rating.