Guide · Static control
Why static accumulator oils start loading at 1 m/s
Updated 2026-10-08 · About 5 min read
In one sentence
Where a flammable atmosphere may form, static accumulator oils start at no more than 1 m/s until the inlet and bottom structure are covered to a depth of twice the inlet pipe diameter; later rates still depend on cargo and operating conditions.
Why the start needs a limit
- Low-conductivity oils can retain charge generated by flow. An uncovered inlet adds turbulence and charged spray; a discharge source in a flammable atmosphere can ignite it.[B1]
From initial loading to a higher rate
- 1
Establish the loading scenario
Assess static accumulation from cargo properties, tank atmosphere and the ship’s procedure rather than assigning one rate to every oil.[B1]
- 2
Apply the initial limit
Where a flammable atmosphere may form, keep the initial velocity for static accumulator oils at or below 1 m/s and avoid splash loading.[B1]
- 3
Check immersion, not elapsed time
Confirm that the inlet and bottom structure are covered to twice the inlet pipe diameter before setting the subsequent rate for the cargo and conditions.[B1]
Separate controls have separate purposes
- The initial rate controls charging from flow and splash. Check post-loading sampling, gauging and waiting arrangements against the tank atmosphere and shipboard procedures. Waiting does not replace the immersion criterion; follow the latest operating requirements applicable to the vessel.[B1]
- Control sampling, gauging and conductive objects introduced into tanks under the ship’s procedure, with bonding and earthing where required.[B1]
- Electrical discontinuity at the ship/shore arm or hose controls arcing from stray currents during connection or disconnection; it is distinct from bonding objects used inside a tank.[B2]
A higher rate needs an operating basis
- After the immersion criterion is met, determine subsequent rates from cargo properties, the loading plan and operating conditions. Check the ship/shore agreement and the latest operating requirements applicable to the vessel; this page does not assign a universal subsequent velocity limit.[B1]
Questions
Can the rate rise after a set initial period?
Elapsed time alone is insufficient. Confirm the two-diameter immersion criterion for the inlet and bottom structure.
Is 1 m/s the limit for the whole loading operation?
It is the initial limit for the stated risk scenario; subsequent rates are separately determined after the immersion criterion is met.
Can a ship/shore bonding cable replace an insulating flange?
A bonding cable should not be treated as a substitute. Ship/shore electrical discontinuity is a separate interface control.